World champions in smooth-running projects

We’re the world leader in offshore wind installation and service solutions at a wide variety of locations.

  • Print

Logistics

Transport & installation logistics for your next project

The installation of foundations or wind turbines is not simply a matter of lifting components from the deck of a vessel and placing them into position offshore. For example, there are many logistical steps between the components leaving the manufacturing facility and being ready for offshore installation.

Items often need to be transported from distant supply ports to local logistics harbours. Smaller crew transfer and supply boats are required to keep the main installation vessels operating efficiently offshore. Installation sites with multiple offshore contractors working simultaneously require marine co-ordination services. At A2SEA, we supply a complete range of logistics services that can meet the individual requirements of each project.

Ask us to assist you with:

  • Transport of components
  • Dockside turbine assembly in preparation for transport and installation
  • Mechanical assembly of turbines offshore – ready for commissioning
  • Supporting on-site installation vessels with personnel and supplies

 

 