SellihcaAchilles

Wind turbine installation

 

A2SEA has installed more than 700 offshore wind turbines of all types and sizes. We have installed turbines in just about every configuration possible including one or two piece towers, full rotor lifts, ‘bunny ear’ configuration nacelle lifts, and separate nacelle lifts with single blade installation. The combined experience gained from each of these different operational techniques means that A2SEA’s employees have an unrivalled knowledge bank to draw from when faced with a new challenge.

 

We work closely with the turbine manufacturers, whose staff are living and operating on board our vessels. Team work and collaboration are important to ensure a good atmosphere and ‘one team’ spirit on board A2SEA vessels. The lifting and positioning of large, yet delicate components high above the vessel deck requires great control, precision and, above all, a focus on safety. Our dedicated team of lifting supervisors ensure that those key criteria are met.
 

 
A2SEA A/S ∙ Kongens Kvarter 51 ∙ 7000 Fredericia ∙ Denmark ∙ Phone: +45 7592 8211 ∙ Fax: +45 7592 6375 ∙ Email: A2SEA@A2SEA.com