The installation of wind turbines is not simply a matter of lifting components from the deck of a vessel and placing them into position offshore. There are a huge number of logistical steps between the components leaving the manufacturing facility and being ready for offshore installation.

Items often need to be transported from distant supply ports to local logistics harbours. Smaller crew transfer and supply boats are required to keep the main installation vessels operating efficiently offshore. Installation sites with multiple offshore contractors working simultaneously require marine co-ordination services. At A2SEA we supply a complete range of logistics services that can meet the individual requirements of each project.
 